S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables

TFARM-SNKT-FTW1
Price
$1,999.92
In stock - Ships in 1 Business Day

Pickup available at Las Vegas Warehouse

Usually ready in 24 hours

Check availability at other stores
Brand Chivari
SKU TFARM-SNKT-FTW1

Product Resources and Tools

Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables TFARM-SNKT-FTW1

S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables

Price
$1,999.92
Bring a warm Fruitwood look to curved layouts using four 99" x 40" serpentine farm tables arranged into an elegant S Curve. This configuration works especially well for head tables and buffet service where the curve creates a natural guest path and a more styled presentation than straight lines. The modular design is built for event pros, allowing fast setup, simple breakdown, and efficient storage for venues and rental fleets.

Key Features and Benefits

  • S Curve Configuration: Curved layout creates natural flow for guests and elevates presentation for head tables and service lines.
  • Includes 4 Serpentine Tables: Kit includes four 99" x 40" serpentine farm tables for a complete curve ready to stage.
  • Matching Fruitwood Finish: Warm wood tone keeps the full layout cohesive across large rooms and photo coverage.
  • Modular, Easy Handling: Breaks into manageable pieces for faster load in, simpler transport, and cleaner storage.
  • Seating Capacity Guidance: S Curve layout with 4 serpentine tables seats about 22 guests comfortably.
  • Footprint Planning: Layout footprint is about 23.85 ft x 5.75 ft, plus allow about 3 ft for guest access around the setup.

Product Videos

99" x 40" (8.25 Foot) Serpentine Fluted Leg Wood Farm Table

AssembledAssembly Required
Seating Capacity4-6 Adults
Product Colors & Material
Leg MaterialWood
Table EdgeWood
Table Top MaterialWood
Product Dimensions (each)
ShapeSemi Circle/Half Round
Size99" x 40" Semi Circle/Half Round
Length99"
Width40"
Height30"
Height StyleStandard Height
Shipping Dimensions (each)
Shipping Length101.00"
Shipping Width51.00"
Shipping Height5.50"
Shipping Weight121.50 lbs

Maintenance and Care

Our Farm Tables also known as Linenless Tables* require some basic care and maintenance to ensure it retains its natural beauty and luster.

  • The stain on our farm table is an oil based stain which helps to repel moisture.
  • Some red wine, beverages, and food may leave water marks on the tabletop.
  • You can clean the tables with a water-based cleaner.  We recommend commonly available wood furniture protectors such as Pledge, Minwax, etc.
  • It’s recommended that you clean then cover your tables after use.

*These tables are sometimes referred to as Linenless Tables because they are naturally beautiful.  They don’t need linens to look great.  You may not want to use a linen as the linen will hide the natural beauty of the table.  Some customers like to add linens under heavy use to protect the table from scratches and stains.  Ultimately, the choice is yours.

Storage:

  • When not in use, store in a cool, dry place away from direct sunlight.
  • If possible, keep it in a protective case or cover when not in use outdoors.

Cleaning:

  • Clean regularly with a soft, damp cloth to remove dirt and debris.
  • For tougher stains, use a mild soap solution and rinse thoroughly.
  • Avoid abrasive cleaners or scrubbers that may scratch the surface.

Sun & Weather Exposure:

  • Farm tables exude a special rustic charm and while they're durable enough for both indoor and outdoor use, they're susceptible to extended exposure to moisture and the elements.
  • Prolonged or repeated exposure to rain, humidity, direct sunlight, or extreme temperatures may cause the wood to warp, crack, split, or discolor, and may compromise the finish or structural integrity of the table.
  • For best results and to maintain product integrity, bring tables indoors immediately after each use and store them in a dry, climate-controlled environment.

Inspection:

  • Regularly inspect for any signs of wear, cracks, or damage.
  • If you notice any issues, address them promptly to prevent further deterioration.

Handling:

  • Despite its durability, handle with care to avoid unnecessary impacts or drops.
  • Use both hands when moving or repositioning the table.

Avoid Harsh Chemicals:

  • Do not use solvents, bleach, or other harsh chemicals for cleaning or maintenance.

By following these care instructions, you can help maintain the appearance and longevity of your table and minimize the risk of weather-related damage. Improper use, care, or storage may void warranty coverage.

Warranty Information

2 Year Total Coverage - 1 Year Limited Warranty plus 1 FREE Year Extended Warranty for a total of 2 years coverage (a $69.98 value!)

Our limited warranty ensures furniture is free from defects in materials and craftsmanship for the specified period, covering the original purchaser only. It excludes damage from misuse, improper maintenance, normal wear and tear, or environmental factors. If eligible, we will repair, replace or provide parts at no cost, covering all shipping and handling fees. See our Warranty Policy for more details.